AN OFFICE CUT FROM THE RIGHT CLOTH

Hambakenwetering 1 k-r, Den Bosch

PROJECT INFORMATION


Campus Hambaken Timber is the first multi-tenant wooden office building in Den Bosch manufactured and assembled by HOLD. Construction of the building was completed in January 2025.


Project website

X7H5

Configuration code


4.000m2

Gross floor area


A++++

Energy Label


8 months

Total construction time


For sister company Campus Offices, HOLD has realized a sustainable expansion at the Campus location in Den Bosch (Campus Hambaken). HOLD provides the ideal solution to accelerate Campus' sustainability ambitions. On part of the parking lot, we realized a five-story HOLD building of seven lanes deep, with a gross floor area of 4,000 m².

After completion, sister company Campus Offices set to work preparing the building for its first tenants. Because HOLD buildings have a high-end finish level, the main concern was aesthetic finishing. For example, Campus implemented its recognizable interior design style in the floor finishes and furniture, the second floor was divided into office units with the flexible wall system, and additional meeting rooms were created in the core section.

On Wednesday, May 8, the building was officially opened by Den Bosch's alderman - just over a year after construction began.

PROJECT MILESTONES

May 2024

Earthworks and foundation

Excavate building pit, pour foundation beam and lay hollow-core slabs. 



July 2024

Wood construction

Solid pinewood elements assembly.

September 2024

Floor structure

Sand cement screed and tile floors per floor.

October 2024

Ceilings and installation work

PCM ceilings, air ducts, electrics and lighting.

December 2024

Finish

Assembling doors and kitchens.

January 2025

Connectivity and delivery

WiFi, wireless office controls and blinds.